Chemistry & Biology Labs Upgrades

Agency:

Miami Dade College

Year Completed:

2022

Scope of work:

The scope of work for this project includes HVAC system upgrades, the replacement of 20 fume hoods in science labs, and electronic controls and programming. New exhaust and supply fans were installed, along with furnishing and installing new VFDs. Ductwork within mechanical rooms and several classrooms was replaced, and duct cleaning was conducted. VAVs and 6 Air Handling Units (AHUs) were replaced. The acoustical ceiling tile and grid system were replaced. It's important to note that this facility was fully occupied during construction, requiring completion of the project in several phases.

Interior Renovation
College B-G

Agency:

Miami Dade College

Year Completed:

2023

Scope of work:

LEGO is currently remodeling and renovating restrooms on four different Miami Dade College campuses, which includes architectural/interior modifications, as well as necessary MEP and fire protection work. 

Chiller Replacement Homestead Campus

Agency:

Miami Dade College

Year Completed:

2022

Scope of work:

The scope of work for this project included replacing a 500-ton chiller and all valves in lines to form, re-painting the base rails for the pumps, removing the concrete pad for future chiller installation, and epoxy coating the new concrete slab. 

Rebuild Tigertail Ropes Course

Agency:

Broward College

Year Completed:

2022

Scope of work:

The pole-based high-challenge course project involved several steps to ensure its success. These steps included examining the existing course, collaborating with stakeholders to set goals and develop a detailed plan, executing the construction of the course with a focus on safety and quality, providing technical staff training, and offering post-installation support to ensure client satisfaction. Thorough documentation, including demo findings and installation procedures, was also provided to the client.

Central Campus B-10

Agency:

Broward College

Year Completed:

2023

Scope of work:

The project involved renovating art and music rooms, replacing fume hoods, doors, and gas piping, painting the exterior of the campus, upgrading MEP systems, and re-roofing over 197,024 SF of roofing with a new SBS-modified Bitumen roofing system. The renovation required extensive coordination and planning to ensure completion before the new school year.

South Campus Stormwater Management

Agency:

Broward College

Year Completed:

2022

Scope of work:

The South campus of Broward College underwent a Stormwater system upgrade project. The work involved excavation of 31000 cubic yards of retention area, grading, compacting, and installation of catch basins, HDPE pipes, and new topsoil with Bahia sod.

Hugh Adams Central Campus

Agency:

Broward College

Year Completed:

2022

Scope of work:

Complete renovation of the men's and women's restrooms on the first and second floors of Building Eight at Broward College's A. Hugh Adams central campus. The scope of work included demolition, concrete work, drywall installation, millwork, HVAC installation, electrical work, security system upgrade, as well as finishing touches like painting, ceiling installation, and flooring.

Building Roof Replacement
Academic #1

Agency:

Florida International University

Year Completed:

2024

Scope of work:

The scope of work for this project involves the roof replacement of the Academic Classroom #1 Building at FIU Biscayne Bay Campus. This includes the demolition of the existing modified bitumen, granule-surfaced built-up roof membrane, and rigid insulation system down to the existing structural concrete deck, as well as cleaning and preparing the surface of the structural concrete roof slab. Additionally, it entails the replacement of existing roof drains with new drains at their existing locations and the installation of a new roof system.

Our Clients

Certificates, Licenses & Affiliations

CERTIFICATE

State of Florida 

Minority Business Enterprise

CERTIFICATE

State of Florida 

Certified General Contractor

CERTIFICATE

State of Florida 

Certified Roofing Contractor

CERTIFICATE

Minority Business Development Agency 

CERTIFICATE

Green Building Council

CERTIFICATE

Society of American Military Engineers (SAME)

CERTIFICATE

American Society for Health Care Engineering (ASHE)

CERTIFICATE

Associated Builders and Contractors of Central Florida

LEGO_LOGO WHITE

MBE, C.G.C., Roofing Contractor
UEI#: W5E4GGV7EWN5

DUNS: 825708287  |  CAGE: 54Y11

Miami

1011 Sunnybrook Rd, Suite #905
Miami, FL 33136
Office: 305.381.8421

FAX: 305.857.9916

Orlando

1801 Lee Road, Suite #205

Winter Park, FL 32789
Office: 407.545.8498

Palm Beach

1615 S. Congress, Suite #127

Delray Beach, FL 33445

Office: 305.381.8421

Tampa 

100 Ashley Dr S Suite #600

Tampa, FL 33602

Office: 305.381.8421

Miami  |  Tampa  |  Orlando  |  Pensacola  |  Palm Beach  |  Jacksonville

Copyright © 2024 LEGO Construction Co. All Rights Reserved

bottom of page
" class="hidden">山西经济网